Skip to main content

Naga Pelikan Offshore platform

Client Premier Oil Ltd
Contractor PT SMOE Engineering
Location Natuna Sea
Completion 20 February 2014

We deliver and commissioning of Main MV Switchgear in the Naga-Pelikan WHP. The design of the MV Switchgear based on Baldwin and Francis UK , Eex’d type UNIFAC-FP. This is the first installation of these special switchgear in Indonesia and design to adapt the specific requirement of the installation. The design required compliance to the hazardous area classification, less space, high reliability, less maintenance and operation following to the project requirement. More detail